22 March 2010

moving in, part deux

I was dreading today, because I thought it would be larger. And by "it", I mean this:

We'd just started getting a handle on things -- most of it was put away, except for the few boxes that were awaiting the return of furniture-they-get-stored-in ... and that furniture was in The Box.

Contents of The Box = everything that didn't fit into the apartment after we merged households. (It sounds so sexy when I describe it like that, doesn't it?) I was scared because I hadn't seen The Box before today -- it was packed (like a mutha!) by the Mr. at his old apartment. And I'd heard that it was the world's biggest game of Tetris ever to pack it. (See below -- it totally was.) But once I saw the actual size, and realized that if you took into account his mattress & box spring, dresser, bedside table, desk & bookcase (all items we were definitely needing), it couldn't be that bad. Right? Well:


Wow. Well played, babe. It's just like moving in all over again ... hooray.

We've already consigned the futon mattress set & lots of t-shirts he's managed to live a healthy & fruitful life without for the last 6 months to the Donate Bin. If they didn't already love us at our local Out of the Closet, they haven't seen anything yet.

05 March 2010

la cucina

Ah, what a difference 2 days & a great big heap of OCD* make. To wit:

We seem to have a kitchen.

I can't believe how much bigger the room looks since we took down the cabinets that flanked the window. (And thanks to my friend M who suggested we put them in the garage, where we can still use them. Brilliant!) Also, it was totally worth the effort & caustic chemicals involved in getting rid of the "oak" veneer ... or as the Mr. has dubbed it, "fauk". Now all we need to do is hang the shelves above the window-adjacent counter. And buy a stove.

I feel obligated to show the reverse angle, for some perverse reason. Or maybe just to reassure myself that there's a whole lot of Project remaining.
Behold: left) the aforementioned shelves, and right) Future Site of Our Kitchen Table.

*I "may" have alphabetized the spice drawer. No, you can't see a picture.**

**Okay, fine:
(for some reason Blogger won't rotate the picture -- oh well.)

04 March 2010

repurposing v1.0

Behold, the 1st in a possibly-many-parted series:

Some of it, we're selling on Craigslist/Bravo Bride/ etc. And the rest of it, well ...

A) at the wedding:


B) after the wedding:


Just doing my part to keep the planet green.

02 March 2010

21 February 2010

pretty pictures!

Finally:
The formerly lead-paint tainted closet doors have been taken outside, stripped, sanded, repainted, given new hardware & re-hung. Now a) we're cool if any children or pregnant women want to come over & lick our walls, and b) I can put my shoes away. Good times.

And from the Tah-Dah! Dept:
I think the towel bar should be a little lower ... but screw it. We have a bathroom! For those of you who are keeping score at home, this pic features:
Pedestal sink from Home Depot: $214
Light from Restoration Hardware Outlet: $52
Bead Board from Stock Lumber: approx $2.50/sq. ft.

It's really hard to photograph a shower that's perpetually back-lit during the day, but hopefully you can tell that we have two (2!!) shower heads -- a rain bath in the ceiling, and a hand-held on the wall.

The storage would be completely installed & allowing me to unpack some of those effing boxes marked "bathroom", if it wasn't for the broken hinge-thingy from Ikea. The Mr. got us a replacement one yesterday, but since I don't speak Needlessly Cruel Swedish Drawings, I'm waiting for contractor-guy to install it tomorrow.
Shelves: $6 each
Brackets: $10/pair
Cabinet: $89
all Ikea
(And yes, I know the brackets don't quite reach the front of the shelves. Since we only plan to store towels on them, I figure they'll hold.

I imagine those will feel really good under foot. I could tell you that with certainty if it wasn't for the fact that we have no hot water in there. As in: I was standing there for over five minutes watching the water run, taunting me with its refusal to rise above Icy Cold. Wrapped in a towel, Ready. To. Bathe. At. Home! I placed a call to contractor-guy, who informed me that he hadn't yet tested/adjusted/what-the-fuck-evered the water yet, but he plans to in the morning. Oh my effing god my shower is a cock tease somebody help me!!! Also: to the students in the 2 classes I have to teach this afternoon -- I'm sorry.

But other than that, I'm rather pleased with how the color scheme turned out. The Mr. has expressed doubts about the shower curtain's stripey-ness (Thomas O'Brien for Target), but I think it ties in the tiles, towels & wall pattern rather extremely-genius-like. Or maybe I'm just giddy from the fumes?

16 February 2010

aaaaand we're back!!!

Phew! I was seriously turning a shade somewhere between cerulean & indigo there, waiting for our FUCKING INTERWEBS TO GET WORKING. Ahem. I'm sorry. I don't mean to swear. (Really. I try not to. I just suck at not-swearing.)

In case anyone has been wondering about the brevity/simplicity of my recent (aka post-move) posts, allow me to elucidate: We had DSL service at the apartment, with a small-ish provider whose service/pricing/support we adored. So naturally we tried to just shift our account with them to the new Owned By Us address. We had to wait 5 (five!!) days, because AT&T makes you suffer if you don't use their 'net service, for the phone to get "turned on". I guess the guy who had to flip a switch was busy that week. Anyway, once the 5-day time frame had elapsed: still no 'net. So we called, and were asked to wait ANOTHER 2 (two!!) days for a technician to come out & investigate.

Which he did. I was here. And a Very Large Dude, who was surprisingly friendly AND helpful, played with some wires outside the house (even though it was raining). And he diagnosed us as 3000 ft. too far from the DSL hub to get service. (Insert Lumbergh voice here:) "Greeaaaaat."

So: back to square 1. Call cable company. They'll come out in 3 (three!!) business days. Except that the 3rd day was Effing President's Day. (Stoopid Presidents.) So we just. finally. got. service. today.

(By the by, my interim posts were made via a nifty iPhone app called BlogWriter. I was very pleased with the results. Get the free version, unless you have the urge to post photos -- then it's a worthwhile $1.99. But you can't delete posts ... hence the bewildering stuff that I just got rid of, from my "learning curve" phase.)

At any rate: Howdy! I'm still here! And we still have no bathroom to speak of. (Epic Construction Timing Fail.) But here's what we do have:
An uber-fancy new light/fan, with switches that independently control both functions! And paint! And some bead board (slightly visible)!

A couple of fixtures! Including a rain bath shower head, and that awesome outlet-find light for over the (eventually) medicine cabinet.

And various kinds of flooring! That's the river rock stuff in the shower floor, and those (totally my fault, expensive-ish) penny tiles on the rest of the floor. Also, a better look at the bead board.

Now all we need is for the Effing Grout to dry, so we can re-connect the toilet. That's all I care to say about that ... except that NO, I'm NOT enjoying this part.

12 February 2010

baby steps, Bob


We have (some) tile. And drywall ... some of it primed. Great things are ahead -- I can feel it. And by "great things" I mean "showering at home".

Dare to dream, kids. Dare to dream.